D&M Placentia Concrete Construction
(714) 798-2825Get an estimateCall (714) 798-2825

Concrete parking lot building in Placentia CA - a lot built for the trucks that use it

Tired of patching a broken lot? We map where the trucks drive first, then build concrete sized for how your lot gets used.

Stamped concrete patio with gray stone-pattern paving, brick seating walls and a built-in grill.

Concrete parking lot building in Placentia, CA is close kin to the driveways we're best known for, only bigger and a lot harder on the concrete. Cars sit still in the stalls, while trash trucks and delivery vans grind through the same few lanes, and that's where an ordinary slab cracks and sinks first. When the design and the build account for those differences, a concrete lot can give good service for many years with little upkeep.

Before we start, you should know what moves the price. It's mostly the lot's size, how much old paving has to come out and what the city's stormwater and street rules ask for. The schedule leans on the city's reviews more than on the pour itself. Your written estimate spells out what we'll do.

How we build a concrete parking lot

  • Truck lanes planned first. We start by finding where the trash truck and delivery vans go, because those lanes take more pounding than the stalls, and concrete industry guidance says dumpster access can need special attention.
  • Base dug out and packed. We dig out and pack the subgrade, what the slab sits on. If the budget's tight, I'd trim the finish before the base, because a soft base takes the slab with it.
  • Footings for poles and walls. Light poles, carport posts and dumpster enclosure walls sit on their own concrete footings, which we dig and pour with the lot so they're set before the paving goes in.
  • Our own crew, with me there. Our own crew does the work, with me on site. I learned on fast new-tract crews that didn't cut corners, and I've run our jobs that way since we opened in 2021.
  • Licensed and insured. We're licensed and insured. The state licensing board describes a concrete contractor's work as forming, pouring, finishing and installing pavement and flat concrete, which is exactly what a parking lot is.

What goes wrong in parking lots

ProblemWhat it looks likeUsual fix
Broken truck lanesWhat it looks like: Cracked, crumbling concrete where the trash truck stops and turnsUsual fix: Saw out and rebuild that lane for the weight
Sinking, uneven panelsWhat it looks like: Panels dropping, edges lifting and trip spots between slabsUsual fix: Dig out, pack new base, pour fresh panels
Pooling waterWhat it looks like: Puddles that sit after rain, or water running toward doorsUsual fix: Regrade and repour so water heads to drains
Dusty, chipping surfaceWhat it looks like: The top wearing away into grit and chips under tiresUsual fix: Repour, timing the pour away from midday heat

Fix it, rebuild it or go pervious

  • Fix the failed sections. When the stalls are sound and only the truck lane or a few sunken panels have failed, we saw those out and rebuild them on a packed base.
  • A new conventional lot. When most of the lot is cracked or drains badly, a full tear-out and repour lets us fix the base and the slope everywhere at once.
  • Pervious concrete. Pervious concrete lets rain pass through to a base layer that holds it while it soaks into the ground. It's traditionally used for parking, and we'll talk through whether it fits your site.

How we plan and build your lot

  1. Walk and measure. You call or send the form, and I come out to walk the lot with you, measure it and see where the trucks and the water go.
  2. Written estimate. You get a written estimate that spells out what we'll do, from the tear-out and base to the truck lanes, joints and clean-up.
  3. City sign-off first. Before anything's dug up, we handle any city permits and inspections, including the encroachment permit for street-side curb or driveway work, filed with our insurance papers.
  4. Build and walk-through. On the day, our crew protects your planters and sprinklers and cleans up as we go, and when it's done, I walk the finished lot with you.

What keeps a concrete lot sound for years

A lot stays sound when water keeps moving off it, so keep the drains clear and call us early when a panel in the truck lane starts breaking up. If it's the building beside the lot that's settling, that's foundation raising, a separate job we also do.

We're based in Placentia and work across Placentia and the cities around it, including Fullerton, Brea and Yorba Linda, for property owners who want someone careful on their lot. For a free estimate, call (714) 798-2825, email hello@placentiaconcretecontractor.com or use the form on this page.

Tell us about your lot

Send the lot's size in square feet, any curb work at the street and where the dumpster sits. We'll get back to you within one business day to set a visit.

(714) 798-2825
  • Free, on-site estimate
  • Everything in writing
  • No obligation to book

Parking lot questions we hear

Does a new parking lot in Placentia need city permits or reviews?

A lot can need several city sign-offs, and they come in order. Planning and zoning clearance comes first, then the city's Building Division reviews the plans, and if grading is involved, the city reviews soils and engineering reports before that permit is issued. To ask about your lot, call the city at (714) 993-8124.

Does the size of my parking lot change Placentia's stormwater rules?

Yes. The city's stormwater brochure lists parking lots of 5,000 square feet or more as priority projects, and those must include on-site measures to control and treat the runoff. That changes the design, so I measure first.

Is pervious concrete a good choice for a parking lot in Placentia?

It can be, since it's traditionally used in parking areas, but industry guidance says its layers are designed around the storms it has to hold, the soil under it and the traffic, so every site needs its own design. NRMCA, the ready-mix industry group, certifies pervious installers, so ask whoever you hire about it.

How much does a concrete parking lot cost in Placentia?

There's no fair number until I've measured, because the lot's size, the tear-out and the base work set most of the price. Rebuilding only the failed truck lanes costs less than a full repour, while pervious concrete and the stormwater measures larger lots need add to it. Your written estimate spells it out.

Will my new concrete parking lot crack like the old one?

Concrete can still crack, but on a lot we build it should crack along control joints, shallow grooves we cut so the slab breaks in a straight line where we chose. Wandering cracks across the stalls usually trace back to joints cut late or a base that was only raked level.

Call about your lot

City reviews come before the pour, so call early, tell us the lot's size and where the trash truck goes, and we'll set a time to walk it.

Call(714) 798-2825